One demand.
Two legal orders.
US electricity regulation divides authority across federal and state institutions. China’s computing-hub policy links national spatial planning with local implementation. Compare how each allocates access, costs and public obligations.
New evidence · 19 October 2026
Newly added to the research atlas. Source publication dates and evidence status appear in each record.
Follow where the law guides.
1. United States
1.1 Federal & regional grid institutions
PJM co-location order2 provisions / source records
1.1.1.1 Co-location and transmission-service architecture
Internal source tag US-R001
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Agency final order under FPA § 206
- Issued
- 2025-12-18
- Status at corpus cutoff
- MODIFIED/SET ASIDE IN PART by 195 FERC ¶ 61,209 (2026); further compliance required, with selected deadlines extended to 2026-11-16; implementation incomplete at the 2026-09-06 cutoff
- Pinpoint
- 193 FERC ¶ 61,217, PP 2–4, 164; Ordering Paragraphs
- Recorded legal proposition
- FERC found PJM's tariff unjust and unreasonable for lack of clear co-location terms and directed three transmission-service options plus process revisions.
- Scope
- Commission-jurisdictional transmission and generator-interconnection service; not plenary retail-load siting.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.1.1.2 Cost allocation for BTM and co-located load
Internal source tag US-R002
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Agency final order under FPA § 206
- Issued
- 2025-12-18
- Status at corpus cutoff
- MODIFIED/SET ASIDE IN PART by 195 FERC ¶ 61,209 (2026); further compliance required, with selected deadlines extended to 2026-11-16; implementation incomplete at the 2026-09-06 cutoff
- Pinpoint
- 193 FERC ¶ 61,217, PP 2–4, 74–85, 397–414
- Recorded legal proposition
- FERC found PJM's BTMG rules unjust and unreasonable because planning did not fully account for affected load and costs could shift to other customers.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
PJM large-load show-cause orderLarge-load transmission integration
Internal source tag US-R003
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Procedural agency order under FPA § 206; preliminary findings only
- Issued
- 2026-06-18
- Status at corpus cutoff
- Held in abeyance by 196 FERC ¶ 61,129, accession 20260814-3059; response/remedial §205 filing due 2026-11-16; no final replacement tariff at 2026-09-06
- Pinpoint
- 195 FERC ¶ 61,211, PP 1–5, 35–105
- Recorded legal proposition
- FERC instituted six separate regional proceedings on 2026-06-18; FERC entered docket-specific abeyance orders on 2026-08-14 (196 FERC ¶¶ 61,128–61,133).
- Scope
- Commission-jurisdictional transmission service and RTO/ISO tariffs.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
SPP large-load show-cause orderLarge-load transmission integration
Internal source tag US-R004
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Procedural agency order under FPA § 206; preliminary findings only
- Issued
- 2026-06-18
- Status at corpus cutoff
- Held in abeyance by 196 FERC ¶ 61,128, accession 20260814-3060; response/remedial §205 filing due 2026-11-20; no final replacement tariff at 2026-09-06
- Pinpoint
- 195 FERC ¶ 61,213, PP 1–6, 35–104
- Recorded legal proposition
- FERC instituted six separate regional proceedings on 2026-06-18; FERC entered docket-specific abeyance orders on 2026-08-14 (196 FERC ¶¶ 61,128–61,133).
- Scope
- Commission-jurisdictional transmission service and RTO/ISO tariffs.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
NYISO large-load show-cause orderLarge-load transmission integration
Internal source tag US-R005
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Procedural agency order under FPA § 206; preliminary findings only
- Issued
- 2026-06-18
- Status at corpus cutoff
- Held in abeyance by 196 FERC ¶ 61,130, accession 20260814-3068; response/remedial §205 filing due 2026-11-16; no final replacement tariff at 2026-09-06
- Pinpoint
- 195 FERC ¶ 61,216, Introduction; Discussion and Briefing Questions
- Recorded legal proposition
- FERC instituted six separate regional proceedings on 2026-06-18; FERC entered docket-specific abeyance orders on 2026-08-14 (196 FERC ¶¶ 61,128–61,133).
- Scope
- Commission-jurisdictional transmission service and RTO/ISO tariffs.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
MISO large-load show-cause orderLarge-load transmission integration
Internal source tag US-R006
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Procedural agency order under FPA § 206; preliminary findings only
- Issued
- 2026-06-18
- Status at corpus cutoff
- Held in abeyance by 196 FERC ¶ 61,133, accession 20260814-3058; response/remedial §205 filing due 2026-11-16; no final replacement tariff at 2026-09-06
- Pinpoint
- 195 FERC ¶ 61,212, Introduction; Discussion and Briefing Questions
- Recorded legal proposition
- FERC instituted six separate regional proceedings on 2026-06-18; FERC entered docket-specific abeyance orders on 2026-08-14 (196 FERC ¶¶ 61,128–61,133).
- Scope
- Commission-jurisdictional transmission service and RTO/ISO tariffs.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
CAISO large-load show-cause orderLarge-load transmission integration
Internal source tag US-R007
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Procedural agency order under FPA § 206; preliminary findings only
- Issued
- 2026-06-18
- Status at corpus cutoff
- Held in abeyance by 196 FERC ¶ 61,131, accession 20260814-3061; Six Cities and WAPA rescission relief narrows respondent scope; response/remedial §205 filing due 2026-11-16; no final replacement tariff at 2026-09-06
- Pinpoint
- 195 FERC ¶ 61,214, Introduction; Discussion and Briefing Questions
- Recorded legal proposition
- FERC instituted six separate regional proceedings on 2026-06-18; FERC entered docket-specific abeyance orders on 2026-08-14 (196 FERC ¶¶ 61,128–61,133).
- Scope
- Commission-jurisdictional transmission service and RTO/ISO tariffs.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
ISO-NE large-load show-cause orderLarge-load transmission integration
Internal source tag US-R008
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Procedural agency order under FPA § 206; preliminary findings only
- Issued
- 2026-06-18
- Status at corpus cutoff
- Held in abeyance by 196 FERC ¶ 61,132, accession 20260814-3056; response/remedial §205 filing due 2026-11-16; no final replacement tariff at 2026-09-06
- Pinpoint
- 195 FERC ¶ 61,215, Introduction; Discussion and Briefing Questions
- Recorded legal proposition
- FERC instituted six separate regional proceedings on 2026-06-18; FERC entered docket-specific abeyance orders on 2026-08-14 (196 FERC ¶¶ 61,128–61,133).
- Scope
- Commission-jurisdictional transmission service and RTO/ISO tariffs.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Order directing computational-load reliability standardsComputational-load reliability standards
Internal source tag US-R009
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Agency final directive under FPA § 215(d)(5) and (f)
- Issued
- 2026-07-16
- Status at corpus cutoff
- Effective directive; no computational-load Reliability Standard or registry criterion was yet approved at baseline
- Pinpoint
- 196 FERC ¶ 61,031, PP 1–2, 8–9; Ordering PP (A)–(C)
- Recorded legal proposition
- FERC ordered NERC to file Phase I computational-load standards and registry changes by 2026-12-31 and a Phase II workplan by 2027-03-01.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Executive Order 143182 provisions / source records
1.1.9.1 Strategic status and federal permitting acceleration
Internal source tag US-R010
- Authority
- President of the United States
- Instrument
- Presidential executive order
- Issued
- 2025-07-23
- Status at corpus cutoff
- Current presidential executive order; directives operate subject to applicable law and appropriations and create no enforceable private right
- Pinpoint
- EO 14318 §§ 1–2, 4–9
- Recorded legal proposition
- EO 14318 defines covered AI data-center projects above 100 MW and directs coordinated federal permitting, federal-land, and financial-support actions.
- Scope
- Executive-branch coordination subject to existing law and appropriations.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.1.9.2 Project qualification and legal limits
Internal source tag US-R011
- Authority
- President of the United States
- Instrument
- Presidential executive order
- Issued
- 2025-07-23
- Status at corpus cutoff
- Current presidential executive order; directives operate subject to applicable law and appropriations and create no enforceable private right
- Pinpoint
- EO 14318 § 2(a)–(d), §§ 3–6, 10(b)–(c)
- Recorded legal proposition
- The order states that implementation is subject to applicable law and appropriations and creates no enforceable right or benefit.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Large Loads Action PlanReliability implementation status
Internal source tag US-R012
- Authority
- North American Electric Reliability Corporation
- Instrument
- Official implementation/program page
- Status at corpus cutoff
- Ongoing; proposed registry and CLO standards remained in comment at baseline
- Pinpoint
- Recent Actions; Resources; proposed CLO-001-1, CLO-002-1, CLO-003-1 posting dated 2026-08-19
- Recorded legal proposition
- The page labels CLO-001-1 through CLO-003-1 and registry changes as proposed/comment materials.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Proposed computational-load registry criteria summaryComputational-load registry criteria
Internal source tag US-R013
- Authority
- North American Electric Reliability Corporation
- Instrument
- Proposal / consultation material
- Issued
- 2026-04-01
- Status at corpus cutoff
- First-round proposal; not approved or enforceable; second-round comment remained open at baseline
- Pinpoint
- Proposal summary pp. 1–3; proposed Appendix 5B changes
- Recorded legal proposition
- NERC proposed new computational-load entity registration architecture and expressly stated related standards were under development.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Computational-load standards development authorizationComputational-load standards development
Internal source tag US-R014
- Authority
- North American Electric Reliability Corporation
- Instrument
- Standards-development authorization / proposal
- Issued
- 2026-05-14
- Status at corpus cutoff
- Drafting authorized; no CLO standard effective at baseline
- Pinpoint
- Standards Committee Action Without a Meeting, Project 2026-02, pp. 1–4
- Recorded legal proposition
- NERC's Standards Committee authorized drafting new or modified standards for computational-load integration.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
NERC announcement of the CEO letter on large-load actionsLegal-status verification
Internal source tag US-R015
- Authority
- North American Electric Reliability Corporation
- Instrument
- Official institutional communication
- Issued
- 2026-08-18
- Status at corpus cutoff
- Current status update; not a Reliability Standard
- Pinpoint
- NERC Newsroom release dated 2026-08-18
- Recorded legal proposition
- NERC's CEO letter confirmed parallel work on computational-load registry criteria and proposed standards following the July FERC order.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
2026 draft National Transmission Needs StudyTransmission and equipment bottlenecks
Internal source tag US-R021
- Authority
- U.S. Department of Energy, Office of Electricity
- Instrument
- Draft official study under FPA § 216(a)
- Issued
- 2026-07
- Status at corpus cutoff
- Draft; public comment/consultation open at baseline
- Pinpoint
- Executive Summary printed pp. ii–iii (PDF pp. 2–3); I.a How to Use This Study, printed p. 2 (PDF p. 18)
- Recorded legal proposition
- DOE's draft diagnoses national/regional transmission needs but expressly does not displace planning processes or select solutions.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
10 U.S.C. § 2921Data-center energy and water efficiency
Internal source tag US-R024
- Authority
- Congress / Office of the Law Revision Counsel
- Instrument
- Federal statute
- Issued
- 2021-12-27
- Status at corpus cutoff
- Current federal statute; binding only within its Department of Defense scope
- Pinpoint
- 10 U.S.C. § 2921(a)(1)(A)–(E), (b)(1)–(2)
- Recorded legal proposition
- Federal statute requires targets for selected existing Do D centers and standards for new Do D data centers, with a national-security waiver.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
FERC Order No. 1920 — long-term regional transmission planning and cost allocationLong-term regional transmission planning
Internal source tag US-R027
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Agency final rule under FPA section 206
- Issued
- 2024-05-13
- Status at corpus cutoff
- FERC Order No. 1920 final rule; subsequently clarified and modified by separately archived Orders 1920-A and 1920-B; compliance and implementation ongoing
- Pinpoint
- Order 1920 series; explainer: Long-Term Scenarios, Evaluation, Cost Allocation, State Engagement
- Recorded legal proposition
- Order 1920 reforms long-term regional planning and cost allocation but does not decide an individual data-center service request.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
DOE emergency order on PJM backup resourcesEmergency use of large-load backup resources
Internal source tag US-R028
- Authority
- U.S. Department of Energy
- Instrument
- Temporary emergency order under FPA § 202(c)
- Issued
- 2026-09-01
- Status at corpus cutoff
- Temporary DOE emergency order under FPA § 202(c); operative at 2026-09-06 baseline and expires 2026-09-08 at 11:59 p.m. Eastern unless modified
- Pinpoint
- Order No 202-26-41,pp 1-2,6-8; Ordering B-L,especially Dcritical-backupexemption,Icostfilings,Knoncapacity,Lexpiryandcontinuingobligations
- Recorded legal proposition
- DOE temporarily authorized PJM to call specified/large-load backup resources only as a last resort before or during EEA 3, with reporting, environmental, cost-recovery and non-capacity-resource qualifications.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Federal Power Act jurisdiction, rates, adequacy, emergency authority and review6 provisions / source records
1.1.18.1 Federal emergency authority
Internal source tag US-R029
- Authority
- Congress; Office of the Law Revision Counsel; U.S. Government Publishing Office
- Instrument
- Federal statute
- Issued
- 1935-08-26
- Status at corpus cutoff
- Current as verified in OLRC preliminary edition on 2026-09-06
- Pinpoint
- 16 U.S.C. § 824a(c)(1)–(5)
- Recorded legal proposition
- FPA § 202(c) supplies broad but temporary emergency authority and specific environmental constraints.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.1.18.2 Administrative rehearing and judicial review
Internal source tag US-R030
- Authority
- Congress; Office of the Law Revision Counsel; U.S. Government Publishing Office
- Instrument
- Federal statute
- Issued
- 1935-08-26
- Status at corpus cutoff
- Current as verified in OLRC preliminary edition on 2026-09-06
- Pinpoint
- 16 U.S.C. § 825l(a)-(c)
- Recorded legal proposition
- FPA § 313 structures rehearing and judicial review for Commission orders; its text does not itself establish the procedure for a Secretary-issued § 202(c) order.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.1.18.3 Jurisdiction and duty-to-serve allocation
Internal source tag US-R101
- Authority
- Congress; Office of the Law Revision Counsel; U.S. Government Publishing Office
- Instrument
- Federal statute
- Issued
- 1935-08-26
- Status at corpus cutoff
- Current as verified in OLRC preliminary edition on 2026-09-06
- Pinpoint
- FPA §201(a), (b)(1); 16 U.S.C. §824(a), (b)(1)
- Recorded legal proposition
- Section 201 expressly confines FERC to matters not subject to state regulation and reserves retail/local-distribution functions.
- Scope
- Federal regulation covers interstate transmission and wholesale sales but not other sales, local distribution, generation facilities, or intrastate transmission except specifically provided.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.1.18.4 Rate filing and nondiscrimination
Internal source tag US-R102
- Authority
- Congress; Office of the Law Revision Counsel; U.S. Government Publishing Office
- Instrument
- Federal statute
- Issued
- 1935-08-26
- Status at corpus cutoff
- Current as verified in OLRC preliminary edition on 2026-09-06
- Pinpoint
- FPA §205(a)-(d); 16 U.S.C. §824d(a)-(d)
- Recorded legal proposition
- Jurisdictional rates and related practices must be just and reasonable and not unduly preferential; public utilities must file tariffs/contracts and normally give 60 days' notice of changes.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.1.18.5 Tariff correction and status discipline
Internal source tag US-R103
- Authority
- Congress; Office of the Law Revision Counsel; U.S. Government Publishing Office
- Instrument
- Federal statute
- Issued
- 1935-08-26
- Status at corpus cutoff
- Current as verified in OLRC preliminary edition on 2026-09-06
- Pinpoint
- FPA §206(a)-(b); 16 U.S.C. §824e(a)-(b)
- Recorded legal proposition
- After complaint or own-motion proceeding, hearing, and an unjust/unreasonable finding, FERC determines and fixes the just-and-reasonable replacement; refund timing is separately bounded.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.1.18.6 Adequate interstate service
Internal source tag US-R104
- Authority
- Congress; Office of the Law Revision Counsel; U.S. Government Publishing Office
- Instrument
- Federal statute
- Issued
- 1935-08-26
- Status at corpus cutoff
- Current as verified in OLRC preliminary edition on 2026-09-06
- Pinpoint
- FPA §207; 16 U.S.C. §824f
- Recorded legal proposition
- Section 207 is a state-commission-triggered interstate-service remedy, not a general retail applicant entitlement.
- Scope
- FERC may not compel enlargement of generation or a sale/exchange that impairs the utility's ability to serve its customers.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
DOE section 403 direction and attached proposed large-load ANOPRProposed national large-load interconnection framework
Internal source tag US-R105
- Authority
- Secretary of Energy
- Instrument
- DOE section 403 direction and attached proposed ANOPR; substantive reforms non-final
- Issued
- 2025-10-23
- Status at corpus cutoff
- DOE proposal docketed in RM26-4; FERC separately invited comments on 2025-10-27 (US-S116); no final nationwide rule or effective federal threshold at 2026-09-06
- Pinpoint
- DOE letter pp.1–2; attached proposed ANOPR PP1–2, 13–29 (PDF pp.3, 10–14); FERC notice pp.1–2
- Recorded legal proposition
- The >20 MW threshold and cost/study concepts are proposals, not a universal operational threshold.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Southwest Power Pool, Inc., Order Accepting Tariff Revisions Subject to ConditionReliability / flexibility and large-load market access
Internal source tag US-R201
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Binding FERC tariff order under Federal Power Act section 205
- Issued
- 2026-01-14
- Status at corpus cutoff
- IN_FORCE effective 2026-01-15; ministerial compliance accepted 2026-03-09
- Pinpoint
- pp. 5-10, 25-31; proposed Tariff Attachment BA §§ 2.1.3.3-.5, 2.2.4 and Attachment AE § 2.22
- Recorded legal proposition
- HILL status covers a new or increased commercial/industrial load at a single site of at least 10 MW at 69 kV or below, or at least 50 MW above 69 kV. Each request receives enhanced study; the HDPS requires a $10,000 nonrefundable fee and $100,000 deposit, plus $200,000 if an EMT study is needed, and has a 90-day target. Ongoing requirements include real-time telemetry, remote disconnect capability, a 20 MW/minute ramp ceiling unless directed otherwise, customer-funded PMU or similar equipment, and ride-through obligations.
- Evidence limit
- FERC accepted the architecture but required ministerial corrections; the order does not establish a national large-load standard and does not prove performance outcomes.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Southwest Power Pool, Inc., Order Accepting CHILLS Tariff Revisions Subject to ConditionMarket access / adequacy / flexibility
Internal source tag US-R202
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Binding FERC tariff order under Federal Power Act section 205
- Issued
- 2026-06-05
- Status at corpus cutoff
- IN_FORCE effective 2026-07-01 subject to condition; compliance filed 2026-07-06 in ER26-1323-002; disposition of that compliance filing NOT_FOUND
- Pinpoint
- pp. 4-8, 34-45; proposed Tariff Part VII § 44.1, § 47.6, § 48 and Schedule 15
- Recorded legal proposition
- CHILLS is an as-available, nonfirm bridge for HILL load awaiting designated resources or network upgrades, with a one-year minimum and seven-year maximum. Firm service has priority; CHILLS shares priority with monthly nonfirm point-to-point service and may not be resold, redirected, reassigned, or transferred. Start may be extended once for up to one year with a nonrefundable annual reservation fee; scarce capacity may be released unless the original customer pays the CHILLS transmission rate. Separate telemetry/metering and extensive curtailment obligations apply.
- Evidence limit
- The June order was conditionally accepted and the July 6 compliance filing remained without a located disposition at the cutoff; a separate FERC section 206 show-cause proceeding also remained open.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Guides for the Use of Environmental Marketing ClaimsGreen authenticity
Internal source tag US-R203
- Authority
- Federal Trade Commission
- Instrument
- Nonbinding FTC interpretive guides; deceptive claims may be challenged under FTC Act section 5 with proof of deception
- Issued
- 2012-10-11
- Status at corpus cutoff
- CURRENT interpretive guides; separate review proceeding does not itself amend them
- Pinpoint
- 16 C.F.R. §§ 260.1(a), (c), 260.15(a)-(d), Examples 1-5; PDF pp. 1-2, 31-34
- Recorded legal proposition
- Unqualified renewable-energy claims may be deceptive where fossil energy is used unless matched with renewable energy certificates; a marketer that sells all RECs for onsite generation cannot also claim to use that renewable energy. The guidance applies to services and business-to-business marketing.
- Evidence limit
- The Guides are not independently binding law and do not create a mandatory national certificate registry, geographic-deliverability rule, or hourly-matching standard.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Generation Attribute Tracking System Operating RulesGreen authenticity / certificate lifecycle
Internal source tag US-R204
- Authority
- PJM Environmental Information Services
- Instrument
- Contractually incorporated registry rules, not legislation or an agency regulation
- Issued
- 2024-01-26
- Status at corpus cutoff
- CURRENT private-registry rules
- Pinpoint
- Revision 12 cover(PDFp 1); Introduction(PDFpp 6-7),Definitions(PDFpp 8-17); §§10-11; §12.5; §13.2; §14. Printedpage numbers are 5 lessthan PDFpage numbers.
- Recorded legal proposition
- GATS creates one uniquely identified certificate for each MWh, records transfers, removes certificates from circulation through holder-initiated or automatic retirement, and uses unsettled certificates in a residual-mix process. Retail LSE certificate obligations for a calendar year may be satisfied only with certificates associated with energy generated in that year.
- Evidence limit
- GATS is a regional contract-based registry rather than a national regulation. Applicable state program rules determine eligibility and deliverability; a GATS certificate is not by itself proof of hourly physical matching or project additionality.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
PJM Interconnection, L.L.C., Order Rejecting Amended Interconnection Service AgreementCo-location filing genealogy and legal-status counterexample
Internal source tag US-R205
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Binding FERC order on the specific section 205 filing
- Issued
- 2024-11-01
- Status at corpus cutoff
- REJECTED filing; later generic PJM framework proceedings must be analyzed separately
- Pinpoint
- 189 FERC ¶ 61,078, Substantive Matters, PDF pp. 39-42
- Recorded legal proposition
- FERC rejected the amended Susquehanna ISA because PJM did not meet the high burden to show that the nonconforming provisions were necessary for project-specific reliability concerns, novel legal issues or other unique factors. Reliance on generally applicable, non-tariff PJM Guidance undermined the claimed uniqueness.
- Evidence limit
- FERC expressly made no determination on whether the PJM Guidance was just and reasonable and declined to decide other unresolved merits. The holding was filing-specific, not a categorical prohibition on co-location.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
PJM Interconnection, L.L.C., Order Addressing Arguments Raised on Rehearing and CompliancePJM co-location transmission-service framework
Internal source tag US-R206
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Binding FERC rehearing/compliance order under Federal Power Act section 206
- Issued
- 2026-06-18
- Status at corpus cutoff
- IN_FORCE as modified/set aside in part; further compliance required; deadlines for directives in PP 91, 370-374, 482 and 541 and the transmission-owner directives were extended to 2026-11-16
- Pinpoint
- 195 FERC ¶ 61,209, PDF pp. 3-4, 24, 200-208, 236-245 and 256-258; see US-S210, pp. 2-4, for extension
- Recorded legal proposition
- The June 2026 order modified/set aside portions of the December 2025 order, resolved parts of the compliance record and required more compliance; selected directives were later extended to November 16, 2026.
- Evidence limit
- FERC's August 18 notice,published August 21,confirms PJM filed ER26-1479-002 on August 17,accession 20260817-5195,requested October 17 effective,and September 8 comments. Theactualfilingtermsandanyacceptance/effectivenessremainunverified; selectedotherdirectivesremaindue November 16. No acceptedenergizationright inferredfromfilingnotice.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
DOE's Use of Federal Power Act Emergency AuthorityEmergency-order correspondence procedure
Internal source tag US-R304
- Authority
- U.S. Department of Energy
- Instrument
- Official agency webpage / nonbinding correspondence guidance
- Issued
- 2012-05-01
- Status at corpus cutoff
- Current DOE institutional guidance at the 2026-09-06 baseline; nonbinding and not a formal docket or rehearing rule
- Pinpoint
- Two correspondence-procedure paragraphs immediately before the issued-orders list
- Recorded legal proposition
- Current DOE guidance separates correspondence receipt from adjudicatory status and preserves the Secretary's ability to act on an application or without one.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Cooling Water Efficiency Opportunities for Federal Data CentersCorrect technical interpretation of a legally used efficiency metric
Internal source tag US-R450
- Authority
- U.S. Department of Energy, Federal Energy Management Program
- Instrument
- Nonbinding technical guidance; metric definition, not an operative duty
- Status at corpus cutoff
- Official guidance available at verification; only stable PUE definition relied upon
- Pinpoint
- Low-Cost/No-Cost Water-Saving Opportunities at Existing Data Centers: first two paragraphs and PUE equation
- Recorded legal proposition
- DOE FEMP defines PUE as total annual facility energy use divided by annual IT-equipment energy use. The numerator includes IT energy; overhead divided by IT energy is not PUE.
- Evidence limit
- This guidance is not the full GB40879 standard and cannot repair missing mandatory Chinese technical clauses.
- Corpus review
- Adds direct primary technical proof for the corrected memo definition, without relabeling guidance as law.
Level 3 Computational Load AlertComputational-load reliability alert
Internal source tag US-R402
- Authority
- North American Electric Reliability Corporation
- Instrument
- Institutional alert. Rule 810 acknowledgment and reporting are mandatory; the substantive Essential Actions are not mandatory Reliability Standards.
- Issued
- 2026-05-04
- Status at corpus cutoff
- Issued May 4, 2026. Acknowledgment was due May 11 and reporting August 3. Substantive actions are voluntary; new CLO standards remain under development.
- Pinpoint
- Instructions, PDF pages 2–3.
- Recorded legal proposition
- The Level 3 alert has mandatory response obligations but does not make its substantive Essential Actions mandatory Reliability Standards.
- Evidence limit
- The alert does not establish individual entity compliance or final CLO standards.
- Corpus review
- QA-US-06: the mixed-effect distinction was independently verified.
Notice of PJM partial co-location compliance filingPJM co-location compliance procedural status
Internal source tag US-R403
- Authority
- Federal Energy Regulatory Commission
- Instrument
- Official procedural notice; it is not approval of tariff terms.
- Issued
- 2026-08-18
- Status at corpus cutoff
- PJM filed August 17; publication was August 21; comments were due September 8. The requested October 17 effective date was not accepted by this notice.
- Pinpoint
- PDF page 4, ER26-1479-002 entry.
- Recorded legal proposition
- The FERC notice confirms actual receipt and notice of PJM’s partial-compliance filing following the June 18 rehearing order; it does not accept the filing.
- Evidence limit
- The actual filing terms, protests and disposition remain unverified.
- Corpus review
- QA-US-09 closed the existence gap without overclaiming effectiveness.
NEWFERC: PJM Large Load Registry accepted; IRAS and BYONC rejectedFederal agency tariff order
Which large-load requirements can an RTO impose without displacing state retail-service jurisdiction?
Internal source tag US-R501
- Issued / announced
- 2026-10-09
- Evidence status
- FINAL ORDER · Registry and Large Load definition accepted effective 2026-10-12; IRAS/BYONC/VRR exclusion rejected; compliance filing required
- Authority
- Federal Energy Regulatory Commission
- Order / docket
- 197 FERC ¶ 61,019 · ER26-3515-000
- Accepted
- 50 MW single-site Large Load definition and Large Load Registry; effective 2026-10-12
- Rejected
- Interim Resource Adequacy Service (IRAS), Bring Your Own New Capacity (BYONC) scheme and related capacity-market treatment
- Legal boundary
- The rejected provisions are not operative tariff rules; Rosner concurrence cautions against involuntary curtailment ahead of voluntary demand response
- Next procedural step
- PJM compliance filing directed within 30 days; later compliance requires separate verification
- Evidence
- Official FERC eLibrary document metadata; official commissioner concurrence. Full order pinpoint should be checked before provision-level quotation
1.2 Georgia
Georgia Public Service Commission Compliance Order Approving Tariff Revision and Large-Load Contract Framework2 provisions / source records
1.2.1.1 Large-load contract and cost protection
Internal source tag US-R022
- Authority
- Georgia Public Service Commission
- Instrument
- Binding state utility-commission order approving compliance tariffs and prescribing contract review safeguards
- Issued
- 2025-04-17
- Status at corpus cutoff
- IN_FORCE; motions for reconsideration do not stay the order absent Commission action
- Pinpoint
- Compliance Order pp. 1-5
- Recorded legal proposition
- For customers at or above the 100 MW aggregate threshold, contract minimum-bill, early-termination, and collateral terms must apply the Commission-approved framework; tariff rates may increase while a contractual minimum bill does not automatically change; Staff may object if an actual contractual amount or language inadequately protects other customers.
- Evidence limit
- Public order establishes review framework, not every contract-specific minimum bill, collateral amount or duration; realized protection remains unproven.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.2.1.2 Procedure and implementation transparency
Internal source tag US-R023
- Authority
- Georgia Public Service Commission
- Instrument
- Binding state utility-commission order approving compliance tariffs and prescribing contract review safeguards
- Issued
- 2025-04-17
- Status at corpus cutoff
- IN_FORCE; motions for reconsideration do not stay the order absent Commission action
- Pinpoint
- Compliance Order pp. 3-5
- Recorded legal proposition
- Each contract for a new customer with an expected aggregate load of 100 MW or more must be filed at least 30 days before execution. Staff may object within 30 days; absent objection it is deemed approved. If Staff objects, it is deemed approved if the Commission takes no action within 30 days after Staff files its objection. Executed contracts remain filing obligations, and Georgia Power must update minimum-bill model inputs annually.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.3 Ohio
AEP Ohio data-center application and tariff implementation guidanceReadiness, study, and queue discipline
Internal source tag US-R016
- Authority
- AEP Ohio
- Instrument
- Official utility application and implementation guidance; subordinate to approved tariff
- Status at corpus cutoff
- Current implementation guidance captured 2026-09-06
- Pinpoint
- AEP official portal, Mandatory Process ¶¶1–4 and Load Study Fees table (archived HTML lines 3376–3415); threshold cross-check in current Schedule DCT, PDF pp. 113–114, 1st Revised Sheets 223-1–223-2
- Recorded legal proposition
- After study/service plan, LOA and ESA must be signed within 60 days or the applicant forfeits its place.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Operative AEP Ohio Data Center Tariff3 provisions / source records
1.3.2.1 Long-term commitment and stranded-cost protection
Internal source tag US-R017
- Authority
- Ohio Power Company d/b/a AEP Ohio; tariff filed pursuant to Public Utilities Commission of Ohio orders
- Instrument
- Commission-approved operative utility tariff
- Issued
- 2026-08-28
- Status at corpus cutoff
- IN_FORCE in the official September 2026 tariff book at the 2026-09-06 cutoff
- Pinpoint
- P.U.C.O. No. 22, Schedule DCT, Sheet Nos. 223-1 through 223-8 (PDF pp. 113-120), especially Sheets 223-4 through 223-7
- Recorded legal proposition
- The operative August 28, 2026 Schedule DCT combines a ramped contract capacity, minimum billed demand, a ramp-plus-eight-year initial term, credit-conditioned collateral, and a 36-month exit payment after the fifth post-ramp year.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.3.2.2 Behind-the-meter generation and contract capacity
Internal source tag US-R018
- Authority
- Ohio Power Company d/b/a AEP Ohio; tariff filed pursuant to Public Utilities Commission of Ohio orders
- Instrument
- Commission-approved operative utility tariff
- Issued
- 2026-08-28
- Status at corpus cutoff
- IN_FORCE in the official September 2026 tariff book at the 2026-09-06 cutoff
- Pinpoint
- P.U.C.O. No. 22, Schedule DCT, Sheet Nos. 223-7 and 223-8 (PDF pp. 119-120)
- Recorded legal proposition
- Schedule DCT does not treat onsite generation as a free reduction of grid responsibility: netting Contract Capacity requires an instantaneous matching load-curtailment capability.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.3.2.3 Generation procurement and service-election readiness
Internal source tag US-R038
- Authority
- Ohio Power Company d/b/a AEP Ohio; tariff filed pursuant to Public Utilities Commission of Ohio orders
- Instrument
- Commission-approved operative utility tariff
- Issued
- 2026-08-28
- Status at corpus cutoff
- IN_FORCE in the official September 2026 tariff book at the 2026-09-06 cutoff
- Pinpoint
- Schedule DCT, 1 st Revised Sheet 223-5; September 2026 tariff book PDF p.117
- Recorded legal proposition
- The interim procedures require 180 days advance notice for New Load initially electing SSO and CRES customers switching/returning to SSO. The customer pays separate procurement costs. If required notice is absent and AEP must serve the customer, customer-funded security and PJM spot energy purchases apply until separate procurement is possible. The final sentence expressly disclaims AEP capacity procurement for load returning to SSO; its wording does not expressly extend that exclusion to initial New Load.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.4 Texas
Texas S.B. 6 large-load statute3 provisions / source records
1.4.1.1 Large-load classification, maturity, and study
Internal source tag US-R031
- Authority
- Texas Legislature
- Instrument
- State statute
- Issued
- 2025-06-20
- Status at corpus cutoff
- Current; effective immediately upon gubernatorial approval because recorded votes exceeded two-thirds in each chamber
- Pinpoint
- S.B. 6 §2, Texas Utilities Code §37.0561(c)-(j)
- Recorded legal proposition
- Unused study-fee balance is credited toward procurement/interconnection obligations at the same site; it is not categorically nonrefundable.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.4.1.2 Connection cost and cancellation risk
Internal source tag US-R032
- Authority
- Texas Legislature
- Instrument
- State statute
- Issued
- 2025-06-20
- Status at corpus cutoff
- Current; effective immediately upon gubernatorial approval because recorded votes exceeded two-thirds in each chamber
- Pinpoint
- S.B. 6 §§1, 2, 7; Texas Utilities Code §§35.004(c-1)-(c-2), 37.0561(h)-(j)
- Recorded legal proposition
- Section 35.004(c-1) applies only to interconnection agreements entered on or after 2025-06-20.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.4.1.3 Emergency curtailment and backup deployment
Internal source tag US-R033
- Authority
- Texas Legislature
- Instrument
- State statute
- Issued
- 2025-06-20
- Status at corpus cutoff
- Current; effective immediately upon gubernatorial approval because recorded votes exceeded two-thirds in each chamber
- Pinpoint
- S.B. 6 §2, §4; Texas Utilities Code §§37.0561(e), 39.170(a)-(b)
- Recorded legal proposition
- Texas law converts specified large-load backup/flexibility into an emergency reliability instrument under ordered conditions.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
ERCOT Batch Zero processBatch study and large-load readiness
Internal source tag US-R034
- Authority
- ERCOT; Public Utility Commission of Texas
- Instrument
- Approved ERCOT Planning Guide revision
- Issued
- 2026-03-04
- Status at corpus cutoff
- Approved 2026-06-18; effective 2026-07-11 except §9.6.1(2)-(3); Batch Zero classifications were delayed for gubernatorial audit and issued provisionally/conditionally on 2026-09-03
- Pinpoint
- PGRR145 §§9, 9.6.1; Governor directive dated 2026-08-03; ERCOT notices M-A080326-01, -03, -04
- Recorded legal proposition
- Status is conditional implementation, not fully completed and not indefinitely suspended.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
ERCOT Large Load Forecasting CriteriaForecast inclusion and project readiness
Internal source tag US-R106
- Authority
- Public Utility Commission of Texas
- Instrument
- Final state administrative rule
- Issued
- 2026-02-09
- Status at corpus cutoff
- Current; permanent criteria cross-reference proposed §25.194 in pending Project 58481, while §25.370(g)-(h) provides 2026 transition criteria
- Pinpoint
- 16 TAC §25.370(b)(2), (c)-(h); 51 TexReg 1110–1112 (PDF pp.68–70 of adoption issue)
- Recorded legal proposition
- §25.370 governs forecast inclusion, not by itself a physical interconnection entitlement or energization deadline.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Governor of Texas data-center audit directiveVerification gate and conditional Batch Zero status
Internal source tag US-R107
- Authority
- Governor of Texas
- Instrument
- Executive directive letter
- Issued
- 2026-08-03
- Status at corpus cutoff
- Directive at baseline; later ERCOT implementation is separately indexed in US-S117–120
- Pinpoint
- Governor directive pp.1–2; ERCOT notices M-A080326-01, -03, -04
- Recorded legal proposition
- A claimed August cancellation/postponement must be coded as delay plus conditional resumption, not permanent rejection.
- Corpus review
- ROOT-04: current provisional-classification claim separately reverified against opened notice04. Search-only historical notices01–03 removed as supporting premises; retained in genealogy solely as unresolved leads.
Batch Zero Conditional Classification issued to Transmission and/or Distribution Service ProvidersBatch Zero classification dispute routes
Internal source tag US-R039
- Authority
- Electric Reliability Council of Texas
- Instrument
- Official regional-system implementation notice
- Issued
- 2026-09-03
- Status at corpus cutoff
- Current conditional-classification update at cutoff
- Pinpoint
- M-A080326-04, Long Description paragraphs 2–3
- Recorded legal proposition
- The September 3 notice identifies differentiated dispute routes; provisional classification is not an unconditional right to interconnect.
- Evidence limit
- Full underlying ADR rules, dispute form and project-specific outcomes are not established by this notice alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.5 Virginia
Data Centers in Virginia2 provisions / source records
1.5.1.1 Generation adequacy and transmission constraints
Internal source tag US-R019
- Authority
- Virginia Joint Legislative Audit and Review Commission
- Instrument
- Final official legislative study
- Issued
- 2024-12-09
- Status at corpus cutoff
- Final official legislative study; nonbinding and evidentiary rather than a source of legal duties
- Pinpoint
- Report 598, pp. ii–v (PDF pp. 5–8), Recommendations pp. x–xi
- Recorded legal proposition
- JLARC documented legal and physical constraints and proposed legislative options.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.5.1.2 Environmental and community legitimacy
Internal source tag US-R020
- Authority
- Virginia Joint Legislative Audit and Review Commission
- Instrument
- Final official legislative study
- Issued
- 2024-12-09
- Status at corpus cutoff
- Final official legislative study; nonbinding and evidentiary rather than a source of legal duties
- Pinpoint
- Report 598, pp. vi–viii (PDF pp. 9–11)
- Recorded legal proposition
- The official study reports aggregate and localized environmental findings and recommends stronger information and local tools.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Va. Code § 10.1-1322.6 — Data-center engine-generator permit limitsAir permitting for backup generation
Internal source tag US-R025
- Authority
- Virginia General Assembly
- Instrument
- State statute
- Issued
- Not established in the source record.
- Status at corpus cutoff
- Current Virginia statute for covered permit applications submitted on or after 2026-07-01
- Pinpoint
- Va. Code § 10.1-1322.6(A)-(C)
- Recorded legal proposition
- Virginia conditions covered new data-center generator permits on Tier 4-equivalent limits while preserving stricter law.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Va. Code § 15.2-2209.5Local siting and community assessment
Internal source tag US-R026
- Authority
- Virginia General Assembly
- Instrument
- State statute
- Issued
- Not established in the source record.
- Status at corpus cutoff
- Current Virginia statute; 2026 cc. 567, 568
- Pinpoint
- Va. Code § 15.2-2209.5(A)-(G)
- Recorded legal proposition
- Virginia requires a defined sound assessment and utility infrastructure information before specified local approvals for ≥100 MW facilities.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Virginia SCC Final Order adopting large-load Rate Schedule GS-53 provisions / source records
1.5.4.1 Large-load rate classification
Internal source tag US-R035
- Authority
- Virginia State Corporation Commission
- Instrument
- Binding final state utility-commission order
- Issued
- 2025-11-25
- Status at corpus cutoff
- IN_FORCE; principal GS-5 obligations effective 2027-01-01
- Pinpoint
- Virginia SCC Final Order pp.22–26
- Recorded legal proposition
- The final order creates GS-5 for 2027 with covered-customer and cohort distinctions; minimum demand billing is 85% distribution,85% transmission and 60% generation, subject to the adopted provisions.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.5.4.2 Long-term commitment and collateral
Internal source tag US-R036
- Authority
- Virginia State Corporation Commission
- Instrument
- Binding final state utility-commission order
- Issued
- 2025-11-25
- Status at corpus cutoff
- IN_FORCE; principal GS-5 obligations effective 2027-01-01
- Pinpoint
- Final Order pp. 23-26
- Recorded legal proposition
- GS-5 begins January 1, 2027 for customers with measured or contracted demand of at least 25 MW on a contiguous site and measured or expected load factor of at least 75%. Contract and collateral provisions apply to customers taking initial service AND signing an ESA on or after January 1, 2027. The term is 14 years including an optional ramp of no more than four years with at least 20% annual ramp. Minimum charges are 85% distribution, 85% transmission and 60% generation, with PJM capacity expense excluded from the generation floor and the specified legacy/maintenance exemptions. Exit during the term entails outstanding minimum charges for the remaining term, subject to reassignment. Starting collateral is $1.5 million/MW, with up to 70% credit reduction and annual release of one-fourteenth.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
1.5.4.3 Procedure and future interconnection review
Internal source tag US-R037
- Authority
- Virginia State Corporation Commission
- Instrument
- Binding final state utility-commission order
- Issued
- 2025-11-25
- Status at corpus cutoff
- IN_FORCE; principal GS-5 obligations effective 2027-01-01
- Pinpoint
- Final Order / SCC fact sheet: interconnection-process filing and alternative allocation
- Recorded legal proposition
- The SCC coupled immediate rate findings with mandated future interconnection/cost-allocation review.
- Evidence limit
- New CIAC tariff approval, projectactualcost recovery, appellateassignments/disposition andstay status are not established by the July 31 orderand August 28 notice alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Amazon Data Services IAD-870 Campus Stationary Source Permit to Construct and OperateAir permitting for data-center generation
Internal source tag US-R301
- Authority
- Virginia Department of Environmental Quality, Northern Regional Office
- Instrument
- Project-specific minor-new-source-review air permit
- Issued
- 2026-03-26
- Status at corpus cutoff
- Final legally enforceable construction-and-operation permit
- Pinpoint
- Transmittal pp. 1-2; permit equipment list and Conditions 2-4, 14-24, 27-28
- Recorded legal proposition
- Virginia's air gate operates through detailed, enforceable site-specific conditions rather than the statutory Tier-4 phrase alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Rider T1 Final OrderDirect-connect cost allocation and residual network cost risk
Internal source tag US-R401
- Authority
- Virginia State Corporation Commission
- Instrument
- Final state utility commission order approving Rider T1 and directing a future tariff filing.
- Issued
- 2026-07-31
- Status at corpus cutoff
- Adopted. Rider T1 became effective September 1, 2026. This order did not approve the new CIAC policy tariff. Microsoft filed a notice of appeal on August 28.
- Pinpoint
- Printed pages 6–7 and 11–17.
- Recorded legal proposition
- The July 31 final order approves amended 12-CP Rider T1 allocation and directs a prospective, net-of-transmission-revenue, direct-connect CIAC proposal. The actual new CIAC tariff is not approved by this order, and residual higher-order network costs remain unresolved.
- Evidence limit
- The actual line-extension tariff, later approval, project outcomes, appellate assignments, disposition and stay status are not established.
- Corpus review
- QA-US-02: source original was read through the official web service but is not locally archived.
Microsoft notice of appeal from July 31 Rider T1 final orderAppellate review of Virginia Rider T1 order
Internal source tag US-R404
- Authority
- Microsoft Corporation; filed with Virginia State Corporation Commission
- Instrument
- Filed party pleading; not a judicial decision or stay.
- Issued
- 2026-08-28
- Status at corpus cutoff
- Microsoft filed a notice of appeal to the Virginia Supreme Court on August 28. Merits, assignments of error and any stay are not established by this notice.
- Pinpoint
- PDF page 1 filing stamp and page 3 notice.
- Recorded legal proposition
- Microsoft filed a notice of appeal on August 28, 2026 from the July 31 PUR-2026-00056 final order.
- Evidence limit
- The notice contains no assignments of error, stay order or appellate disposition. It cannot establish reversal or an automatic stay.
- Corpus review
- QA-US-02 procedural posture verified from the actual filed pleading.
2. China
2.1 National — departmental rules
Classified Management Catalog for Environmental Impact Assessment of Construction Projects (2021 Edition)EIA classification
Internal source tag CN-R306
- Authority
- Ministry of Ecology and Environment
- Instrument
- Departmental rule/catalog
- Issued
- 2020-11-30
- Status at corpus cutoff
- Current at baseline; a revised 2026 catalog had received in-principle approval on 2026-09-03 but was not yet promulgated
- Pinpoint
- Arts. 4-5; component-specific catalog items
- Recorded legal proposition
- China's national EIA gate is catalog/component based rather than a uniform full-EIA mandate for every facility labeled a data center.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Measures for Public Participation in Environmental Impact AssessmentEIA public participation
Internal source tag CN-R307
- Authority
- Ministry of Ecology and Environment
- Instrument
- Departmental rule
- Issued
- 2018-07-16
- Status at corpus cutoff
- Current
- Pinpoint
- MEE Order4 arts.2,9–11,14–27,30–31,34
- Recorded legal proposition
- The national participation rule's Article 2 turns on the legally required EIA document type, not merely the label 'data center'.
- Corpus review
- P2: staged disclosure is in9–11 and22–27; art31 allows scoped industrial-park simplification, while art30 excludes unrelated land/property/employment claims from this EIA participation channel.
2.2 National — laws, rules and standards
Energy Law of the People's Republic of China5 provisions / source records
2.2.1.1 Strategic competence, planning, and access
Internal source tag CN-R001
- Authority
- National People's Congress Standing Committee
- Instrument
- National law
- Issued
- 2024-11-08
- Status at corpus cutoff
- Current
- Pinpoint
- Energy Law arts. 11–20, 31, 36–37
- Recorded legal proposition
- The Energy Law establishes multi-level planning, power-system coordination, and a general reliable-supply duty subject to legal/contractual grounds.
- Scope
- Framework national law requiring subordinate rules, plans, market instruments, and local implementation.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
2.2.1.2 Strategic energy governance and market organization
Internal source tag CN-R002
- Authority
- National People's Congress Standing Committee
- Instrument
- National law
- Issued
- 2024-11-08
- Status at corpus cutoff
- Current
- Pinpoint
- Energy Law arts. 6–7, 15–20, 40–45
- Recorded legal proposition
- The Energy Law establishes national energy planning and unified-market institutions and encourages, rather than mandates, long-term agreements for energy production/supply/sales, transmission-network construction and use.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
2.2.1.3 Green-energy obligation and measurement
Internal source tag CN-R003
- Authority
- National People's Congress Standing Committee
- Instrument
- National law
- Issued
- 2024-11-08
- Status at corpus cutoff
- Current
- Pinpoint
- Energy Law arts. 23, 34–35
- Recorded legal proposition
- The Energy Law supplies statutory foundations for renewable-consumption duties, GECs, metering, and user demand response.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
2.2.1.4 Energy emergency and resilience
Internal source tag CN-R004
- Authority
- National People's Congress Standing Committee
- Instrument
- National law
- Issued
- 2024-11-08
- Status at corpus cutoff
- Current
- Pinpoint
- Energy Law arts. 52–55; art. 73 (liability)
- Recorded legal proposition
- The Energy Law requires qualifying large users to prepare emergency plans (art.53), authorizes listed emergency measures (art.54), and requires compliance with lawful unified command with compensation according to law (art.55). It does not classify all data centers as protected critical load.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
2.2.1.5 Network access disputes and statutory enforcement
Internal source tag CN-R037
- Authority
- National People's Congress Standing Committee
- Instrument
- National law
- Issued
- 2024-11-08
- Status at corpus cutoff
- Current
- Pinpoint
- Energy Law arts.43,67,70–72
- Recorded legal proposition
- Art.67 permits provincial-or-higher energy-authority coordination of network access/use disputes and court proceedings if coordination fails, while also allowing direct court filing. Arts.70–72 provide enforcement consequences for specified supply, nondiscrimination and information duties.
- Evidence limit
- No matched project-dispute outcome sample.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Basic Rules for Electricity Market Operation2 provisions / source records
2.2.2.1 Electricity-market actors and access
Internal source tag CN-R005
- Authority
- National Development and Reform Commission
- Instrument
- Departmental rule
- Issued
- 2024-04-25
- Status at corpus cutoff
- Current
- Pinpoint
- Order20 arts.3–8 (members, registration, operations, fair grid access); arts.10–15 (energy, ancillary services, capacity and trading)
- Recorded legal proposition
- Order20 recognizes electricity users and new entities including storage, VPPs and load aggregators (art.4); establishes registration (art.5); requires fair network opening and regulated transmission/distribution prices (art.7); and distinguishes energy, ancillary-service and capacity transactions (arts.10–13).
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: removed unsupported credit requirement from the proposition attributed solely to Order 20.
2.2.2.2 Market duties and system responsibility
Internal source tag CN-R006
- Authority
- National Development and Reform Commission
- Instrument
- Departmental rule
- Issued
- 2024-04-25
- Status at corpus cutoff
- Current
- Pinpoint
- Order20 arts.16–22 (market/ancillary-service conditions); arts.23–29 (metering/settlement); arts.30–40 (system security, risk and disclosure)
- Recorded legal proposition
- Order20 combines market participation with dispatch, security checks, metering/settlement, market-risk controls and disclosure obligations; it does not make bilateral procurement independent of system operation.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Basic Rules for Electricity Market RegistrationElectricity-market registration
Internal source tag CN-R007
- Authority
- National Energy Administration
- Instrument
- Administrative normative rule
- Issued
- 2024-09-13
- Status at corpus cutoff
- Current
- Pinpoint
- Registration Basic Rules arts.1–7,10–20,25–30,32–45,51
- Recorded legal proposition
- NEA Rule 76 standardizes market registration categories and procedures nationally.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: registration/change/exit propositions need operative procedural articles rather than arts.1–7 alone. Art.39 supplies a contractual exit pathway, not a universal minimum bill.
Power Demand-Side Management Measures (2023)2 provisions / source records
2.2.4.1 Demand response and flexible load
Internal source tag CN-R008
- Authority
- National Development and Reform Commission and five other departments
- Instrument
- Administrative normative measure
- Issued
- 2023-09-15
- Status at corpus cutoff
- Current
- Pinpoint
- DSM Measures arts.12–20; PDF pp.4–7; art.54 (five-year validity)
- Recorded legal proposition
- The DSM Measures distinguish voluntary response (art.12), a2025 provincial capability target of3%–5% of maximum load (art.14), integration with energy/ancillary/capacity mechanisms (art.16), and market-linked compensation principles (art.19). The target is not evidence of achieved response capacity.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: preserve special >=5% provincial qualification and target-versus-individual-duty distinction.
2.2.4.2 Orderly electricity use and cost principles
Internal source tag CN-R009
- Authority
- National Development and Reform Commission and five other departments
- Instrument
- Administrative normative measure
- Issued
- 2023-09-15
- Status at corpus cutoff
- Current
- Pinpoint
- DSM Measures art.12 and arts.38–41; PDF pp.11–12
- Recorded legal proposition
- The DSM Measures distinguish voluntary demand response (art.12) from orderly-use administrative/technical control after other balancing measures are insufficient (art.38), then allocate planning/execution roles (arts.39–41).
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Power Load Management Measures (2023)2 provisions / source records
2.2.5.1 Load management and controllability
Internal source tag CN-R010
- Authority
- National Development and Reform Commission; National Energy Administration
- Instrument
- Administrative normative measure
- Issued
- 2023-09-07
- Status at corpus cutoff
- Current
- Pinpoint
- Load Management Measures arts.3–12,13,23–32,33–36
- Recorded legal proposition
- Load-management rules separately govern voluntary response agreements, compulsory orderly-use execution and a funded technical-control infrastructure. They allocate some implementation costs between the grid and users rather than assigning all costs to one side.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
2.2.5.2 Curtailment priority and implementation
Internal source tag CN-R011
- Authority
- National Development and Reform Commission; National Energy Administration
- Instrument
- Administrative normative measure
- Issued
- 2023-09-07
- Status at corpus cutoff
- Current
- Pinpoint
- Load Management Measures arts.15–18,24,26–29,31–32
- Recorded legal proposition
- The measures prohibit indiscriminate orderly-use restrictions in the name of energy-saving target assessments (art.15), prioritize specified users (art.16), restrict specified noncompliant/inefficient loads (art.17), and distinguish ordinary notice from emergency exceptions (arts.27–29).
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Interim Measures for Power Reliability ManagementPower reliability management
Internal source tag CN-R012
- Authority
- National Development and Reform Commission
- Instrument
- Departmental rule
- Issued
- 2022-04-16
- Status at corpus cutoff
- Current
- Pinpoint
- NDRC Order 50 arts.2–8,16–31,35–39,45–50
- Recorded legal proposition
- Order No. 50 provides general reliability-management rules but no data-center-specific technical standard.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: adds materially relevant user/important-user provisions; earlier pinpoint did not cover the user chapter or information reporting.
Guiding Opinions on Accelerating Virtual Power PlantsVirtual power plants and aggregated flexibility
Internal source tag CN-R013
- Authority
- National Development and Reform Commission; National Energy Administration
- Instrument
- Policy guidance / administrative normative document
- Issued
- 2025-03-25
- Status at corpus cutoff
- Current; provincial implementation required
- Pinpoint
- Guidance I; II(1)–(2); IV(5)–(7); V(8)–(11); VI(12)–(13)
- Recorded legal proposition
- The 2025 guidance sets national VPP development goals and recognizes aggregated adjustable load as system/market resource.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: issuance date is not a separately stated commencement date; market obligations require section V, not I–IV alone.
Notice on Orderly Development of Single-User Green-Power Direct Connection3 provisions / source records
2.2.8.1 Single-user green-power direct connection
Internal source tag CN-R014
- Authority
- National Development and Reform Commission; National Energy Administration
- Instrument
- Administrative normative policy
- Issued
- 2025-05-21
- Status at corpus cutoff
- IN_FORCE; national single-user framework requiring provincial implementation and project-specific approval/filing
- Pinpoint
- Notice 650 I(1); II(3)–(6); IV(14); V (provincial implementation)
- Recorded legal proposition
- Notice 650 establishes a single-user, physically traceable direct-connection pathway with quantitative self-use and renewable-share constraints, not an unrestricted private-wire exemption.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: quantitative and export conditions in II(6) expressly concern grid-connected projects; do not silently equate its pre-2030 wording with Notice1192's new-project-from-2030 wording.
2.2.8.2 Direct-connection cost and reliability responsibility
Internal source tag CN-R015
- Authority
- National Development and Reform Commission; National Energy Administration
- Instrument
- Administrative normative policy
- Issued
- 2025-05-21
- Status at corpus cutoff
- IN_FORCE; national single-user framework requiring provincial implementation and project-specific approval/filing
- Pinpoint
- Notice 650 II(5); III(7)–(11); IV(12)–(14)
- Recorded legal proposition
- The framework assigns internal balancing and interruption risk to the project while preserving payment for residual public-grid and policy services.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P1: corrected renewable-consumption difficulty mistranslated as general grid difficulty; narrowed storage mandate and cost attribution.
2.2.8.3 Green-claim authenticity
Internal source tag CN-R016
- Authority
- National Development and Reform Commission; National Energy Administration
- Instrument
- Administrative normative policy
- Issued
- 2025-05-21
- Status at corpus cutoff
- IN_FORCE; national single-user framework requiring provincial implementation and project-specific approval/filing
- Recorded legal proposition
- Notice 650 requires an auditable physical interface but makes certificate ownership and transfer a separate legal/accounting layer.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Notice on Orderly Development of Multi-User Green-Power Direct Connection2 provisions / source records
2.2.9.1 Multi-user green direct connection and project structure
Internal source tag CN-R017
- Authority
- National Development and Reform Commission; National Energy Administration
- Instrument
- Administrative normative policy
- Issued
- 2026-05-14
- Status at corpus cutoff
- IN_FORCE; national multi-user framework requiring provincial implementation and project-specific approval/filing
- Pinpoint
- Notice 688 I; II(1)–(3); III(4)–(6)
- Recorded legal proposition
- Notice 688 extends direct connection to multiple independent users and expressly prioritizes computing facilities, but requires one project-level legal and operational interface.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P1: the exclusion is not all grid operators; II(2) identifies public-grid enterprises that operate transmission. Pinpoint corrected to actual section numbering.
2.2.9.2 Multi-user project as system participant
Internal source tag CN-R018
- Authority
- National Development and Reform Commission; National Energy Administration
- Instrument
- Administrative normative policy
- Issued
- 2026-05-14
- Status at corpus cutoff
- IN_FORCE; national multi-user framework requiring provincial implementation and project-specific approval/filing
- Pinpoint
- Notice 688 III(4)–(6); IV(7)–(11); V (implementation)
- Recorded legal proposition
- The project becomes a market, dispatch, metering and certificate interface; multi-user internal allocation is not equivalent to independent unrestricted retail choice.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P1/P2: source has numbered items1–11, not clauses7–16; corrected curtailment scope, optional initial bidding, storage accounting and optional internal allocation.
Implementation Rules for Renewable-Energy Green Electricity Certificates (Trial)2 provisions / source records
2.2.10.1 Green-certificate issuance and title
Internal source tag CN-R019
- Authority
- National Energy Administration
- Instrument
- Administrative normative rule
- Issued
- 2025-11-28
- Status at corpus cutoff
- IN_FORCE on issuance; valid for three years
- Pinpoint
- GEC Rules arts.3,10–17,19–32,37–38,41,43,45
- Recorded legal proposition
- The implementing rules organize issuance, transfer and retirement. Art.31 introduces same-production/consumption-year retirement claims fromJan1 2026, while the rules as a whole take effect from issuance underart.45.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: added art.17 for tradability,19/41 for five-year retention and43 for duplicate certificates/falsification.
2.2.10.2 Self-use, storage and certificate limitations
Internal source tag CN-R020
- Authority
- National Energy Administration
- Instrument
- Administrative normative rule
- Issued
- 2025-11-28
- Status at corpus cutoff
- IN_FORCE on issuance; valid for three years
- Pinpoint
- GEC Rules arts.17,20,23,25–33,43
- Recorded legal proposition
- The rules distinguish tradable/non-tradable attributes, storage limitations and retirement scenarios. Annual vintage consistency does not itself establish hourly physical delivery.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: art.33 is required for the stated objection pathway.
Notice on GEC issuance for non-public-grid renewable projectsNon-public-grid GEC issuance
Internal source tag CN-R021
- Authority
- National Energy Administration General Office
- Instrument
- Administrative implementation notice
- Issued
- 2026-06-05
- Status at corpus cutoff
- Current
- Pinpoint
- Notice 60 §§ 1–4; Attachment steps 1–8
- Recorded legal proposition
- Notice60 establishes a data-submission and verification pathway for issuing green certificates to renewable generation not directly connected to the public grid, including eligible off-grid, internal-grid and direct-connection projects.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: corrected 'closes an evidentiary pathway,' which suggested restriction rather than creation of a verified issuance route.
Special Action Plan for Green and Low-Carbon Development of Data Centers2 provisions / source records
2.2.12.1 National data-center green/low-carbon targets
Internal source tag CN-R022
- Authority
- NDRC, MIIT, NEA, National Data Administration
- Instrument
- National policy plan
- Issued
- 2024-07-03
- Status at corpus cutoff
- Current plan; targets are not self-executing project permits
- Pinpoint
- Action Plan I; II(1),(2),(4),(5); III(1); PDF pp.1–4
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: the seven-page plan has no target table; replaced generic/inaccurate locator with actual sections and preserved policy-force qualification.
2.2.12.2 Energy-compute coordination
Internal source tag CN-R023
- Authority
- NDRC, MIIT, NEA, National Data Administration
- Instrument
- National policy plan
- Issued
- 2024-07-03
- Status at corpus cutoff
- Current plan; targets are not self-executing project permits
- Pinpoint
- Action Plan II(1)–(6); III(1)–(3); IV(2)–(3); PDF pp.1–7
- Recorded legal proposition
- The plan treats data-center efficiency, supply structure, siting, and operational flexibility as an integrated policy problem.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: source-grid-load-storage is not the literal mechanism stated in this plan; the actual text addresses coordinated siting, power-compute joint operation, load adjustment, equipment, monitoring and differentiated management.
Implementation Opinions on East Data–West Compute and the National Integrated Computing Network2 provisions / source records
2.2.13.1 Compute geography and national hub concentration
Internal source tag CN-R024
- Authority
- NDRC, National Data Administration and other departments
- Instrument
- National policy guidance
- Issued
- 2023-12-25
- Status at corpus cutoff
- Issued policy guidance; stated end-2025 targets are historical milestones at baseline, not verified outcomes.
- Pinpoint
- Implementation Opinions §§ I–III, especially items (5), (9), and national-hub targets
- Recorded legal proposition
- The Opinions use spatial planning and network coordination to move suitable workloads toward energy/resource-rich regions.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: avoid importing an unsupported numerical hub count into this instrument-specific record.
2.2.13.2 Compute-electricity coordination
Internal source tag CN-R025
- Authority
- NDRC, National Data Administration and other departments
- Instrument
- National policy guidance
- Issued
- 2023-12-25
- Status at corpus cutoff
- Issued policy guidance; stated end-2025 targets are historical milestones at baseline, not verified outcomes.
- Pinpoint
- Implementation Opinions III(9); V(13)–(14)
- Recorded legal proposition
- The national compute-network policy explicitly coordinates computing deployment with green electricity and grid resources.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: compute-electricity integration is section V, while cross-regional scheduling is III(9); section IV concerns compute/data/algorithms.
Action Plan for High-Quality Development of Computing InfrastructureComputing-infrastructure capacity and utilization
Internal source tag CN-R026
- Authority
- Ministry of Industry and Information Technology and five other departments
- Instrument
- National policy plan
- Issued
- 2023-10-08
- Status at corpus cutoff
- Issued policy plan with stated2025 target horizon; no achievement or automatic electricity-user reclassification established.
- Pinpoint
- Action Plan introduction; I(3); II(1),(5),(6); III; PDF pp.1–3,9–12
- Recorded legal proposition
- The plan describes computing infrastructure as an important component of new information infrastructure and sets2025 development, green-efficiency and security objectives. It does not by itself reclassify data centers out of ordinary electricity-user status.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: removed unsupported legal-category contrast 'rather than ordinary commercial load' and clarified elapsed target horizon.
Maximum allowable values of energy efficiency and energy efficiency grades for data centersMandatory data-center energy efficiency
Internal source tag CN-R027
- Authority
- State Administration for Market Regulation / Standardization Administration
- Instrument
- Mandatory national standard
- Issued
- 2021-10-11
- Status at corpus cutoff
- Current mandatory national standard at the baseline; a revision was under consultation through 2026-09-09 and was not final
- Pinpoint
- SAMR national-standard metadata: title, mandatory/current status, basic information issue/effective dates and revision link; no technical clauses independently retrieved
- Recorded legal proposition
- Official SAMR/SAC metadata confirms current mandatory status, issue date 2021-10-11 and effective date 2022-11-01.
- Evidence limit
- PRIMARY_NOT_RETRIEVED: full technical standard initially unavailable; official metadata only. See G06.
- Corpus review
- P1 archive correction: original primary archive was a reader shell. Replace with verified SAMR metadata archive. Keep full-text measurement boundaries/grade limits UNKNOWN; no CAPTCHA bypass.
Official consultation page for the data-center efficiency-standard revisionRevision of mandatory PUE standard
Internal source tag CN-R028
- Authority
- Standardization Administration
- Instrument
- Official consultation notice / standard-development metadata
- Issued
- 2026-07-09
- Status at corpus cutoff
- Consultation open through 2026-09-09; not effective
- Pinpoint
- SAMR consultation notice dated 2026-07-09; Plan 20251056-Q-469 project page
- Recorded legal proposition
- SAMR has a mandatory-standard revision in consultation, but no replacement standard was issued by baseline.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: proposed12-month period must not be stated as an already-fixed legal commencement rule.
Technical specification for trusted evaluation of carbon efficiency of computing for data centersCompute-carbon efficiency
Internal source tag CN-R029
- Authority
- Standardization Administration / Ministry of Ecology and Environment
- Instrument
- Recommended national-standard development plan
- Issued
- 2026-04-28
- Status at corpus cutoff
- Planned/drafting; not an issued standard
- Pinpoint
- SAMR national-standard project 20262489-T-467: scope, stage and 15-month cycle
- Recorded legal proposition
- SAMR metadata records a recommended national-standard project for trusted evaluation of data-center computing carbon efficiency, including planned definitions, calculation/accounting methods and evaluation procedures. No final formula or technical standard is established by this metadata.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: metadata alone does not establish the specific compute-output-adjusted formula.
Measures for Energy Conservation Review and Carbon-Emissions Evaluation of Fixed-Asset Investment Projects2 provisions / source records
2.2.18.1 Energy review and carbon evaluation as project gate
Internal source tag CN-R030
- Authority
- National Development and Reform Commission
- Instrument
- Departmental rule
- Issued
- 2025-07-17
- Status at corpus cutoff
- Current NDRC departmental rule; expressly replaced the 2023 Order No. 2 measures
- Pinpoint
- NDRC Order31 arts.2–3,8–10,13–14
- Recorded legal proposition
- A covered enterprise project may not start construction before a favorable energy-review opinion; an already-built noncompliant project may not operate.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: pinpoint actual threshold, scope and application articles rather than instructing readers to choose among arts.8–34.
2.2.18.2 Change control, acceptance and enforcement
Internal source tag CN-R031
- Authority
- National Development and Reform Commission
- Instrument
- Departmental rule
- Issued
- 2025-07-17
- Status at corpus cutoff
- Current NDRC departmental rule; expressly replaced the 2023 Order No. 2 measures
- Pinpoint
- NDRC Order31 arts.18–19,21,23–26,28–34
- Recorded legal proposition
- Energy review continues through construction change, acceptance and operation; approval is not a one-time paper event.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: separated construction-stage amendment, two-year lapse and operational rectification.
Administrative Reconsideration Law of the People’s Republic of ChinaAdministrative reconsideration
Internal source tag CN-R033
- Authority
- National People’s Congress Standing Committee
- Instrument
- National law
- Issued
- 2023-09-01
- Status at corpus cutoff
- Current
- Pinpoint
- Administrative Reconsideration Law arts. 1–3, 11–14, 20–30, 62–78
- Recorded legal proposition
- China provides a general administrative reconsideration route that may cover qualifying energy/permitting acts; it is not a bespoke electricity-market appeal.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Regulation on Emergency Response, Investigation and Handling of Electric Power Safety AccidentsElectric-power accident response
Internal source tag CN-R034
- Authority
- State Council
- Instrument
- Administrative regulation
- Issued
- 2011-07-07
- Status at corpus cutoff
- Operative at the 2026-09-06 baseline and through 2026-12-31; superseded by the revised regulation on 2027-01-01
- Pinpoint
- State Council Order599 arts.5–6,12–15,18–19,37
- Recorded legal proposition
- Order No. 599 remained the operative administrative regulation on the baseline date.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: emergency-plan and restoration statements need arts.6,12–14, not only5,15,18–19.
Revised Regulation on Emergency Response, Investigation and Handling of Electric Power Safety AccidentsFuture emergency and accident regime
Internal source tag CN-R035
- Authority
- State Council
- Instrument
- Administrative regulation
- Issued
- 2026-08-30
- Status at corpus cutoff
- Promulgated revised administrative regulation; future-effective and not operative at the baseline
- Pinpoint
- State Council Order No. 845 arts. 5-6, 8-15, 19-20, 25-26, 27-34, 38
- Recorded legal proposition
- Order No. 845 was promulgated on 2026-08-30 but expressly begins 2027-01-01.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Administrative Litigation Law of the People’s Republic of ChinaJudicial review of administrative action
Internal source tag CN-R036
- Authority
- National People’s Congress Standing Committee
- Instrument
- National law
- Issued
- 2017-06-27
- Status at corpus cutoff
- Current
- Pinpoint
- Administrative Litigation Law arts. 1–6, 12–13, 44–49, 70–78
- Recorded legal proposition
- Administrative litigation supplies general judicial review for qualifying agency decisions but not every planning policy, grid dispatch act or private contract dispute.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Electricity Law of the People's Republic of ChinaService territory and duty to supply
Internal source tag CN-R101
- Authority
- National People's Congress Standing Committee
- Instrument
- National law
- Issued
- 2018-12-29
- Status at corpus cutoff
- Current third-amended text
- Pinpoint
- Electricity Law arts.25–30, 64
- Recorded legal proposition
- China's statute states a direct service-area supply duty, but not an unconditional immediate energization right for any project size.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Regulation on Electricity Supply and UseCapacity-constrained service and connection readiness
Internal source tag CN-R102
- Authority
- State Council
- Instrument
- Administrative regulation
- Issued
- 2019-03-02
- Status at corpus cutoff
- Current second-revision text in National Administrative Regulations Database
- Pinpoint
- Regulation arts.8–11, 20–24, 28, 32–35
- Recorded legal proposition
- Duty, capacity allocation, technical readiness, and contract are separate legal layers.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
Rules on Electricity Supply Business3 provisions / source records
2.2.25.1 Application and readiness
Internal source tag CN-R103
- Authority
- National Development and Reform Commission
- Instrument
- Departmental rule
- Issued
- 2024-02-08
- Status at corpus cutoff
- Current; replaces 1996 Supply Business Rules under article 110
- Pinpoint
- Supply Business Rules arts.19–23; PDF pp.6–7
- Recorded legal proposition
- China uses document-, capacity-, and plan-validity gates rather than a single national MW-based queue threshold.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
2.2.25.2 Process timing and connection
Internal source tag CN-R104
- Authority
- National Development and Reform Commission
- Instrument
- Departmental rule
- Issued
- 2024-02-08
- Status at corpus cutoff
- Current; replaces 1996 Supply Business Rules under article 110
- Pinpoint
- Supply Business Rules arts.22–23, 47; PDF pp.6, 17–18
- Recorded legal proposition
- The instrument separates application response, supply-plan validity, inspection, and connection after pass.
- Corpus review
- P2: removed 'generally' from the mandatory three-working-day inspection cap while retaining prerequisites.
2.2.25.3 Technical readiness and enforceability
Internal source tag CN-R105
- Authority
- National Development and Reform Commission
- Instrument
- Departmental rule
- Issued
- 2024-02-08
- Status at corpus cutoff
- Current; replaces 1996 Supply Business Rules under article 110
- Pinpoint
- Supply Business Rules arts.45,58–59,94–96,102,109–110
- Recorded legal proposition
- Technical compliance is a genuine access condition even without a large-load queue label.
Notice Improving Pricing Mechanisms to Promote Nearby Consumption of New-Energy GenerationResidual-grid pricing and cost causation
Internal source tag CN-R201
- Authority
- National Development and Reform Commission; National Energy Administration
- Instrument
- National administrative normative pricing policy
- Issued
- 2025-09-09
- Status at corpus cutoff
- IN_FORCE
- Pinpoint
- Notice1192 I; II(1)–(3); III; IV
- Recorded legal proposition
- The 2025 pricing notice converts the beneficiary-pays principle into a concrete residual-grid charge architecture effective October 1, 2025.
- Evidence limit
- Provincial tariff inputs and project connection capacity determine the actual amount; the national formula is not itself a project bill.
- Corpus review
- P1: export spot settlement was incorrectly unconditional. Added the alternative two-part tariff and instrument-specific2030 scope; preserved loss/system/public-policy charge distinctions.
Notice issuing the Basic Rules for the Medium- and Long-Term Electricity MarketMedium- and long-term market access, contracts and green-power traceability
Internal source tag CN-R401
- Authority
- National Development and Reform Commission; National Energy Administration
- Instrument
- Joint departmental administrative normative document / national medium- and long-term electricity-market basic rules
- Issued
- 2025-12-17
- Status at corpus cutoff
- Current at baseline; five-year term. Article98 repeals the 2020 basic rules and the 2024 green-electricity-trading special chapter.
- Pinpoint
- Basic Rules arts.10–12,45,47,51–55,64–68,98
- Recorded legal proposition
- Current national rules govern medium- and long-term market participation, transaction constraints, green-traceability contracts and emergency dispatch; they repeal the earlier 2020 basic rules and 2024 green-electricity special chapter on March1,2026.
- Evidence limit
- No project-specific data-center contract, trader qualification decision, quantity limit or operational outcome is established.
- Corpus review
- QA-CN current-rule repair; exact legal propositions independently checked in the archived official HTML.
NEW2026 National Green Computing Facilities Recommendation Notice (工信厅联节函〔2026〕433号)Ministerial and agency recommendation notice
How does a voluntary green-computing recommendation mechanism use operating data to shape facility standards and incentives?
Internal source tag CN-R501
- Issued / announced
- 2026-09-21
- Evidence status
- ISSUED · 2026 application/recommendation cycle; NOT a universal mandatory facility standard
- Issuing bodies
- MIIT, NDRC, National Financial Regulatory Administration, Government Offices Administration and NEA offices
- Document number
- 工信厅联节函〔2026〕433号 · dated 2026-09-08, published 2026-09-21
- Eligibility
- Facilities must have been stably operating as complete systems for more than one year, with independent power/cooling and clear boundaries
- Assessment
- Efficiency, carbon and water indicators; renewable-electricity share; rack/resource utilization, subject to attached evaluation criteria
- Deadline
- Recommendation submissions due 2026-11-16
- Legal classification
- Administrative application/recommendation and dynamic list management; do not equate list thresholds with mandatory operating rules
2.3 National — policy instruments
State Council General Office Notice on Standardizing Urban Utility ChargesConnection-cost boundary
Internal source tag CN-R106
- Authority
- State Council General Office; NDRC and other departments
- Instrument
- State Council General Office normative policy approving interdepartmental opinion
- Issued
- 2020-12-23
- Status at corpus cutoff
- Current policy framework; local implementation determines detailed funding boundaries
- Pinpoint
- Opinion §II(2), §III(5), implementation from 2021-03-01
- Recorded legal proposition
- Cost allocation is boundary- and scope-specific, not simply 'utility pays all connection costs.'
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
2.4 Provincial & local — Beijing
Beijing Provisions on Strengthening Energy Review of Data-Center Projects3 provisions / source records
2.4.1.1 Local data-center energy review and PUE
Internal source tag CN-R032
- Authority
- Beijing Municipal Development and Reform Commission
- Instrument
- Local administrative normative rule
- Issued
- 2023-07-03
- Status at corpus cutoff
- Current according to official source
- Pinpoint
- Beijing Provisions arts.2,5,7,10,14–15
- Recorded legal proposition
- Beijing links project energy review to energy-scaled PUE ceilings, renewable planning/verification, monitoring and differential operating electricity prices. The2023 rule cites a now-replaced national Order2; current national Order31 must be read alongside it.
- Evidence limit
- Implementation outcomes are not established by legal text alone.
- Corpus review
- P2: preserve original ambiguous progression units and exclude existing-grid renewable share; distinguish entry scope from art.7 new/expanded PUE scope.
2.4.1.2 Project maturity, demand evidence and utilization discipline
Internal source tag CN-R038
- Authority
- Beijing Municipal Development and Reform Commission
- Instrument
- Local administrative normative rule
- Issued
- 2023-07-03
- Status at corpus cutoff
- Current according to official source
- Pinpoint
- Beijing Provisions arts.3–4,11–12
- Recorded legal proposition
- Beijing uses demand evidence, ownership-linked unstarted-project screening and a utilization-triggered change application. These are concrete administrative demand-credibility controls, not merely national planning aspirations.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
2.4.1.3 Cooling-water and resource-management conditions
Internal source tag CN-R039
- Authority
- Beijing Municipal Development and Reform Commission
- Instrument
- Local administrative normative rule
- Issued
- 2023-07-03
- Status at corpus cutoff
- Current according to official source
- Pinpoint
- Beijing Provisions arts.8–10
- Recorded legal proposition
- Beijing data-center energy-review provisions include express reclaimed-water and water-management conditions; they do not themselves issue a water-abstraction permit.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
2.5 Provincial & local — Beijing / Beijing Economic-Technological Development Area (Yizhuang New Town)
Notice issuing Measures to Promote Green, High-Quality Development of Data Centers in the Beijing Economic-Technological Development AreaLocal project gating, economic-development agreements and energy-use limits
Internal source tag CN-R402
- Authority
- Beijing Economic-Technological Development Area Management Committee
- Instrument
- Local administrative normative measure
- Issued
- 2024-03-13
- Status at corpus cutoff
- Official local page identifies the measure as valid at baseline
- Pinpoint
- Measures I (scope); II(8)–(10); final provision
- Recorded legal proposition
- The local measure combines a presumptive no-new-project position with a narrowly described agreement pathway, energy-use ceiling and compliance review. It is local and does not establish an executed contract or a general Chinese nationwide rule.
- Evidence limit
- No project-specific agreement, breach clause, enforcement decision or evidence of actual collection is publicly established here.
- Corpus review
- QA-CN counterexample repair from a complete current official local measure.
2.6 Provincial & local — Fujian / Fuzhou
Fuzhou public-complaint transfer and inspected-entity disposition table, Batch 152 provisions / source records
2.6.1.1 Operational noise and backup-generator smoke
Internal source tag CN-R303
- Authority
- Fuzhou Municipal Ecology and Environment Bureau / inspection-response authorities
- Instrument
- Official environmental-inspection complaint disposition record
- Issued
- 2026-08-06
- Status at corpus cutoff
- Completed official investigation and corrective-direction record
- Pinpoint
- Table row 4
- Recorded legal proposition
- The official table reports that the Unicom machine-room air-conditioning and old backup diesel affected nearby residents and that the ecology/environment bureau required further air-conditioning noise reduction by2026-09-30. The table is site-specific implementation evidence, not proof of a quantified noise-limit breach or completed remediation.
- Corpus review
- P2 source classification: an official inspection-disposition table reports institutional findings/actions; the underlying individual corrective order or monitoring report is not archived. RC TierB institutional implementation evidence, not an autonomous statutory rule.
2.6.1.2 Construction noise and dust
Internal source tag CN-R304
- Authority
- Fuzhou Municipal Ecology and Environment Bureau / inspection-response authorities
- Instrument
- Official environmental-inspection complaint disposition record
- Issued
- 2026-08-06
- Status at corpus cutoff
- Completed official investigation and corrective-direction record
- Pinpoint
- Table row 7
- Recorded legal proposition
- The authority substantiated dust-control defects but rejected the claimed noise violation on monitoring and work-hour evidence.
- Corpus review
- P2 source classification: an official inspection-disposition table reports institutional findings/actions; the underlying individual corrective order or monitoring report is not archived. RC TierB institutional implementation evidence, not an autonomous statutory rule.
2.7 Provincial & local — Guizhou / Gui'an New Area
Acceptance notice for the EIA report form for the Gui'an Huawei Cloud Data Center AZ3 Machang Area Phase I 220 kV substation project (nuclear and radiation)Project environmental-acceptance documentary lead
Internal source tag CN-R302
- Authority
- Guizhou Provincial Department of Ecology and Environment
- Instrument
- UNRESOLVED project-page documentary lead; not substantive authority for reliance.
- Issued
- 2025-03-03
- Status at corpus cutoff
- UNRESOLVED — earlier researcher snapshot was not independently re-opened through its canonical official URL during QA.
- Pinpoint
- Official-index retrieval note only; underlying notice could not be independently re-opened during QA.
- Recorded legal proposition
- No technical condition, approval effect, permit term or implementation outcome from this underlying notice is independently verified.
- Evidence limit
- Underlying official page, text and legal effect remain unavailable to QA; do not rely on prior extracted technical detail.
- Corpus review
- QA-CN exclusion: inaccessible snapshot is not treated as primary evidence.
2.8 Provincial & local — Nanjing, Jiangsu
Nanjing Operating Measures for Government-Enterprise Shared Electricity Connection WorksLocal connection-cost allocation and readiness timing
Internal source tag CN-R107
- Authority
- Nanjing Municipal Development and Reform Commission and other municipal authorities
- Instrument
- Municipal administrative normative measure
- Issued
- 2025-08-25
- Status at corpus cutoff
- Current; supersedes the 2022 trial local approach
- Pinpoint
- Nanjing Measures arts.2–3,5,7,10–12,19,21–22
- Recorded legal proposition
- A local rule operationalizes national boundary policy through split electrical/civil funding and a one-month source-plan step.
- Corpus review
- P2 omission/counterevidence: do not contrast all China planning controls with US contractual demand credibility as if Chinese contracts are absent.
2.9 Provincial & local — Ningxia / Zhongwei / Shapotou District
Public notice of social-stability risk assessment for the 330 kV substation and export line of the Datang Zhongwei Cloud Base Data Center green-power supply 500 MW wind projectTransmission/green-supply project procedure
Internal source tag CN-R305
- Authority
- Shapotou District Development and Reform Bureau
- Instrument
- Project-specific social-stability-risk-assessment public notice
- Issued
- 2026-03-24
- Status at corpus cutoff
- Official public-participation notice for associated generation/transmission project
- Pinpoint
- Project overview; risk-scope and five-working-day input period
- Recorded legal proposition
- A data-center green-power arrangement generated project-specific social-stability review for its dedicated transmission facilities.
- Corpus review
- Second-pass QA checked record/source linkage, legal-status qualification and resolved comparative use. Limit the proposition to the cited pinpoint and stated evidence gap.
2.10 Provincial & local — Shaanxi / Xixian New Area, Fengxi New City
Public notice of proposed EIA approval decision for ICBC Xi'an Data Center Xixian Campus Project (Phase I)Project EIA documentary lead
Internal source tag CN-R301
- Authority
- Fengxi New City Ecology and Environment working department
- Instrument
- UNRESOLVED project-page documentary lead; not substantive authority for reliance.
- Issued
- 2026-05-21
- Status at corpus cutoff
- UNRESOLVED — earlier researcher snapshot was not independently re-opened through its canonical official URL during QA.
- Pinpoint
- Official-index retrieval note only; underlying notice could not be independently re-opened during QA.
- Recorded legal proposition
- No technical condition, approval effect, permit term or implementation outcome from this underlying notice is independently verified.
- Evidence limit
- Underlying official page, text and legal effect remain unavailable to QA; do not rely on prior extracted technical detail.
- Corpus review
- QA-CN exclusion: inaccessible snapshot is not treated as primary evidence.
Public notice of production-construction-project water-and-soil-conservation plan approval results, July 2026Water-and-soil-conservation documentary lead
Internal source tag CN-R308
- Authority
- Shaanxi Xixian New Area Fengxi New City Management Committee / Fengxi Government Service Center
- Instrument
- UNRESOLVED project-page documentary lead; not substantive authority for reliance.
- Issued
- 2026-07-31
- Status at corpus cutoff
- UNRESOLVED — earlier researcher snapshot was not independently re-opened through its canonical official URL during QA.
- Pinpoint
- Official-index retrieval note only; underlying notice could not be independently re-opened during QA.
- Recorded legal proposition
- No technical condition, approval effect, permit term or implementation outcome from this underlying notice is independently verified.
- Evidence limit
- Underlying official page, text and legal effect remain unavailable to QA; do not rely on prior extracted technical detail.
- Corpus review
- QA-CN exclusion: inaccessible snapshot is not treated as primary evidence.
2.11 Provincial & local — Xinjiang Uyghur Autonomous Region
Xinjiang's first multi-user green-power direct-connection projects announcedImplementation outcome / counterexample search
Internal source tag CN-R203
- Authority
- Xinjiang Development and Reform Commission
- Instrument
- Official provincial implementation/status report; not a legal instrument
- Issued
- 2026-05-22
- Status at corpus cutoff
- CURRENT status report at cutoff
- Pinpoint
- Official Xinjiang DRC release dated 2026-05-22
- Recorded legal proposition
- The official Xinjiang DRC release reports two multi-user direct-power projects for data-center loads. The existence of that report is verified; construction and operational performance are not independently verified.
- Evidence limit
- The release reports projects as having landed and gives projections; it does not establish completed construction, actual generation, achieved hourly matching or commercial success.
2.12 Provincial & local — Yunnan Province
Notice issuing Yunnan's Implementation Plan for Promoting Green-Power Direct-Connection ConstructionProvincial implementation and project exit
Internal source tag CN-R202
- Authority
- Yunnan Provincial Development and Reform Commission; Department of Industry and Information Technology; Yunnan Provincial Energy Administration
- Instrument
- Provincial administrative implementation document
- Issued
- 2025-07-08
- Recorded legal proposition
- Yunnan operationalizes the national invitation for provincial screening and exit mechanisms through local/project review, listing and post-entry assessment. It does not establish a universal private exit-damages formula.
- Evidence limit
- Its pre-October 2025 pricing language must be read with the later national 1192 pricing notice; listed or reviewed status is not proof of construction or performance.
- Corpus review
- P1/P2: exact title, at-least5workingdays, collection-substation distance, firm20%exportcap and national-versus-provincial exit distinction corrected.
2.13 Provincial & local — Zhengzhou, Henan
Zhengzhou Implementing Rules for Electricity Connection Works (Trial)Local connection-cost allocation and counterexamples
Internal source tag CN-R108
- Authority
- Zhengzhou Municipal Development and Reform Commission and other municipal authorities
- Instrument
- Municipal administrative normative measure
- Issued
- 2022-03-18
- Status at corpus cutoff
- Still invoked by Zhengzhou authorities in official 2026 response; no superseding instrument located by 2026-09-06
- Pinpoint
- Zhengzhou Rules arts.2–4,6–12,20,23,25–26; official2026response confirms continuing invocation
- Recorded legal proposition
- Local variation and explicit exclusions defeat any inference of uniform user-free connection costs throughout mainland China.
- Corpus review
- P2 omission: preserved explicit local contractual breach arrangements and conditional construction timing; article26 provides one-year trial with continued execution absent objections.